This is what lands in your inbox after every visit

Most contractors ask you to trust that the work was done. KELVON sends the evidence. Every scheduled visit produces a GPS tagged site report the same day, and every site carries a running maintenance log that builds your compliance record automatically.

Industry guidance now tells facility and strata managers to ask every contractor for a sample report before signing. You do not have to ask. Here it is.

1. Site visit report

Issued within hours of every scheduled visit. Sample below is representative. Client name and address are anonymised.

KELVON · Site Visit Report
Grounds. Kept.
Report No. KV-2026-0417
Issued same day
SiteDistribution Centre A
LocationDandenong South, VIC
Visit dateScheduled service
CrewIn house, 2 operators
Arrival (GPS verified)07:04
Departure (GPS verified)09:38
Service typeProgrammed monthly
Site inductionCurrent
ZoneWork completedConditionStatus
Main entry & gatehouseTurf cut and edged. Sightline vegetation cut back at boundary fence line.Sightlines clear both directionsComplete
Truck marshalling yardLicensed herbicide application to hardstand cracks, kerb lines and fence base.Growth controlledComplete
Loading dock apronDebris and litter cleared. Two stormwater grates cleared of leaf build up.Drainage free flowingComplete
Staff car park islandsBeds weeded, mulch topped where thin. Low branches lifted clear of parked vehicles.ClearComplete
Northern perimeterFence line sprayed and cleared to 600mm.CCTV sightline restoredComplete
Southern boundaryNot treated this visit. Grass encroaching on shared path edge.Edge breaking downMonitor
Eastern drain channelSediment build up observed. Outside scheduled scope.Partial obstructionAction req.

Operator notes. Eastern drain channel sediment is building faster than the last two visits and is outside the current scope. Recommend a one off clear before the next heavy rain. Quote available on request. No other safety observations. Site left clean, all green waste removed.

GPS tagged photographs · attached to this report

Main entry
before / after
Marshalling yard
after treatment
Grates cleared
time stamped
Drain channel
issue flagged

Every photograph is GPS tagged and time stamped at the point of capture. Nothing is staged, reused or supplied from another site.

2. Running maintenance log

One log per site, updated after every visit and issued with each report. It is your maintenance history, your audit trail and your evidence file, built without you touching it.

KELVON · Maintenance Log
Distribution Centre A · Dandenong South
Programmed monthly service
Contract: fixed price, annual
VisitScope deliveredIssues raisedResolution
Visit 06Full programmed scope. Perimeter spray, entry sightlines, dock apron, car park beds.Eastern drain sediment. Southern boundary edge.Drain quote issued. Boundary edge scheduled next visit.
Visit 05Full programmed scope. Additional leaf clearing after storm event.Storm debris across staff car park.Cleared same visit at no additional cost. Photographed.
Visit 04Full programmed scope. Hedge reduction at main entry.Hedge obstructing signage sightline.Reduced and reshaped. Sightline restored. Closed.
Visit 03Full programmed scope. First herbicide cycle on marshalling yard.Weed growth through hardstand cracks.Treated. Recheck scheduled. Closed at visit 04.
Visit 02Full programmed scope.None raised.
Visit 01Baseline service. Site condition documented across all zones.Baseline photographs captured for all zones.Reference set established for ongoing comparison.

Why the log matters. When your insurer asks whether the site was maintained, when a safety auditor asks for evidence, when head office questions the spend, or when an owners corporation committee asks what they are paying for, the answer is already written and photographed. You are not reconstructing it from memory or chasing a contractor for records they never kept.

How often you receive them

Site visit report

Every scheduled visit, without exception. Issued the same day, usually within hours of the crew leaving your site. If we attended, you get a report. If you did not get a report, we did not attend.

Maintenance log

Updated after every visit and reissued with each report, so the current version is always the complete version. No quarterly catch up, no annual summary written from memory.

Compliance pack

Site specific SWMS before commencement, and $20M public liability certificates sent proactively on renewal. You never have to request either one.

The reporting is not an add on and it is not a premium tier. It is included in every fixed price KELVON contract, because a contractor who will not show you the evidence is asking you to take their word for it, and taking a contractor at their word is how sites decline quietly for eighteen months before anyone notices.

Want a sample report for your own site?

Request a proposal and a sample GPS photo report comes with it, alongside an itemised scope and a fixed price. Within 24 hours of assessment.